Master Bath Remodel: Rancho Cucamonga

We removed the existing bathroom, moved a wall out 3 feet, moved plumbing, electrical and replaced lighting.  A new window was added, with a handicap accessible tile floor and tub.  We installed a new sink, painted and decorated.  Say hello to an easy to access shower.

Kitchen Remodel: Rancho Cucamonga

Custom cabinets, granite counters, hardwood flooring, paint, new appliances, and the addition of a new bar area. We completely remodeled the kitchen, starting with the removal of the old kitchen.  A bar area was added and granite counters were installed along with custom cabinets, and new hardwood floors.  New paint, appliances and decoration were the […]

Nail Technician Showroom and Classroom: Anaheim

Commercial showroom and classroom To start the project we had to demo the existing carpet, tile and T bar ceiling.  We then installed a hard top ceiling and added can lights.  We moved interiors walls to accomodate the space, installed tile wanescoat in the bathrooms and moved the kitchen/breakroom.  We added plumming to the upstairs, […]

Mongolian Grill Restaurant: Chino Hills

Commercial construction for a Mongolian Restaurant in Chino Hills, CA We turned an old chinese restaurant into a new mongolian grill-restaurant.  We had to demo the existing chinese restaurant and frame/finish the new walls.  We moved the gas lines, floor sinks, and all plumbing according to the plan.  We also added new lighting and a […]

Room Addition: Chino

We added approximately 500 square feet to the south end of the house enlarging the master bedroom and incorporating a new master bathroom with a bathtub, shower, toilet and dual-sink vanity.  The previous master bedroom became a sitting area.  We installed a Solatube as an energy-efficient lighting solution during daylight hours.

Room Addition: Chino

Project Type: Room Addition Services: New Build, Electrical, Mechanical, Framing, Drywall, Roofing, Paint, Flooring, and Carpentry Project Hours: 180 hours Date of Completion: 09/19/2011 This room addition and electrical panel upgrade was completed in 7 weeks! A craft room with lots of built in cabinets and hardwood floors installed.

Interior Remodel: San Clemente

Project Type:Residential Addition/Remodel Services: Carpentry, Plumbing, Electrical, Mechanical, Drywall, Paint & Flooring Project Hours: 220 hours Date of Completion: 04/15/2011  

Kitchen Relocation: Upland

We added 400 square feet to the north end of the house; the new location of the kitchen.  Along with the foundation, framing, drywall and stucco, additional prep work was required for plumbing new drain and water lines, adding electrical circuits and branched air conditioning/heating ducts to service the new heart of the home.  The […]